|
|
Nov 26, 2024
|
|
Catalog 2013-2014, Final Edition [ARCHIVED CATALOG]
|
AEC 231 - Estimating II: Cost AnalysisCredits: 3 Focuses on estimating techniques used to establish and verify costs of materials, equipment, and labor and the time requirements related to building construction projects. Emphasis is placed on preparation of an estimate of construction costs of a commercial building. Prerequisite(s): AEC 107 or ARC 107 and MAT 108 with minimum grade of “C” or better or permission of instructor. Three credits.
|
|
|